歡迎訪問無錫市思必德科技有限公司網站!公司15年的環氧地坪工程技術經驗值得您信賴!!
思必德
 
 
十五年專注于環氧地坪設計施工工程
普通型環氧地坪
環氧砂漿地坪
環氧彩砂地坪
環氧自流平地坪
環氧防靜電地坪
環氧玻璃鋼(FRP)地坪
乙烯基酯重防腐地坪
非金屬金屬耐磨地坪
混凝土滲透性密封劑
自流平水泥地坪
丙烯酸地坪
EPPU聚合型工業地坪
停車場地坪
環保型無毒防霉墻面
有機硅丙烯酸室外防腐
PVC地坪
 
當前位置 -> 首頁新聞資訊水性無錫環氧地坪的施工工藝和注意事項 發布時間:(2019/2/21)

水性無錫環氧地坪的施工工藝和注意事項

標簽:混凝土密封固化劑 | 混凝土密封固化劑廠家

水性環氧樹脂是指環氧樹脂以微粒或液滴的形式分散在以水為連續相的分散介質中而配得的穩定分散體系。固化效果是衡量水性體系產品的重要指標。水性環氧樹脂體系的固化成膜機理水性環氧樹脂涂料是一種乳液涂料,其成膜機理與一般的聚合物乳液涂料如丙烯酸乳液的成膜有很大的區別,同時與溶劑型環氧樹脂涂料的成膜也不完全相同。

Waterborne epoxy resin is a stable dispersion system of epoxy resin dispersed in the form of particles or droplets in the dispersing medium with water as continuous phase. Curing effect is an important index to measure the product of water-borne system. Waterborne epoxy resin curing film forming mechanism waterborne epoxy resin coating is an emulsion coating. Its film forming mechanism is quite different from that of general polymer emulsion coatings, such as acrylic emulsion, and is also not identical with that of solvent based epoxy resin coatings. 水性環氧地坪漆施工工藝

Construction Technology of Waterborne Epoxy Floor Paint

1 施工步驟

1. Construction steps

(1)批補:中涂后用砂紙將環氧地坪打磨,并用水性環氧涂料(中涂)與石英粉配成的膩子依實際需要施工數道,要求達到平整無孔洞,無批刀印及砂磨印為準

(1) batch repairing: sandpaper is used to polish the floor after intermediate coating, and putty made of water-borne epoxy paint (intermediate coating) and quartz powder is constructed several times according to actual needs. The requirements are flat and without holes, no batch knife printing and sanding printing shall prevail.

(2)底涂:將混凝土基材處理完畢并清理干凈后就可進行底涂(輥涂或刷涂),輥涂或刷涂應均勻,厚薄一致,該底涂具有一定的透水氣功能,能增強基材強度并增加涂層對基材的附著力。

(2) Primer: After the concrete base material is treated and cleaned up, it can be primer (roll coating or brush coating). Roller coating or brush coating should be uniform and uniform in thickness. The primer has a certain permeability function, which can enhance the strength of the base material and increase the adhesion of the coating to the base material.

(3)中涂:在已配好的水性環氧涂料(中涂)中加入石英砂和石英粉配成水性環氧砂漿,用鏝刀將其均勻涂布,用于增加厚度及涂層抗壓強度

(3) Intermediate coating: water-borne epoxy mortar is prepared by adding quartz sand and quartz powder into the prepared waterborne epoxy coating (intermediate coating). It is evenly coated with a trowel knife to increase the thickness and compressive strength of the coating.

(4)面涂:用輥筒將水性環氧地坪涂料面涂輥二道,完工后要求整體地面光澤柔和、潔凈、顏色均一、無空鼓

(4) Surface coating: the water-borne epoxy floor coating surface is rolled on two rollers by roller. After completion, the whole floor should be soft, clean, uniform in color and no empty drum.

(5)養護:面層實干需要24小時,在這期間應進行封閉,以免影響表面潔凈光滑的效果。3天后方可上人,完工保養7天后方可正式投入使用(以25℃為準,低溫時開放時間需適度延長)。

(5) Maintenance: It takes 24 hours for the surface to be dry. During this period, it should be closed to avoid affecting the effect of clean and smooth surface. Three days later, it can be put into use. After 7 days of completion and maintenance, it can be officially put into use (whichever is 25 C, the opening time at low temperature needs to be prolonged moderately).

水性環氧地坪漆施工注意事項:

Waterborne epoxy floor paint construction precautions:

1、控制兌水量。水性環氧地坪漆面漆兌水量過大會引起抗劃傷性、光澤度等性能下降。

1. Control the amount of water added. Excessive water addition of waterborne epoxy flooring varnish will cause scratch resistance and gloss deterioration.

2、材料使用。水性環氧地坪漆的底漆、面漆應在規定時間內用完,一旦超過該時間段,涂料變稠后不可加水稀釋再用。

2. Material use. Primers and topcoats of waterborne epoxy floor paints should be used up within the prescribed time. Once they exceed that time period, the paint can not be diluted with water and reused.

3、環境。在溫度低于10℃或下雨天不建議施工。

3. Environment. Construction is not recommended when the temperature is below 10 C or rainy days.

4、使用干燥工具。施工水性環氧地坪漆的輥筒、刷子等工具需無明水。建議輥筒采用短毛輥筒。

4. Use drying tools. The rollers and brushes used in the construction of waterborne epoxy floor paint need no clear water. Short hair roller is recommended.

2 施工準備

2. Construction preparation

(1)材料:水性環氧地坪 [1] 涂料底涂、中涂、面涂,石英砂,石英粉等相關材料。

(1) Material: Water-borne epoxy floor coatings, such as primer, intermediate coating, surface coating, quartz sand, quartz powder and other related materials.

(2)工具:基材打磨工具、吸塵器、批補刮刀、輥筒、小型攪拌器等。

(2) Tools: base material grinding tools, vacuum cleaners, batch scrapers, rollers, small mixers, etc.

(3)施工條件

(3) Construction conditions

a、將地面水泥砂漿剔鑿并清掃干凈,地面如有油脂類雜質,須用溶劑擦拭干凈

A. Cut and clean the ground cement mortar. If there are oil impurities in the ground, clean it with solvent.

b、原水泥地面要求堅硬、平整、不起砂,地面如有空鼓、脫皮、起砂、裂痕等,必須按要求處理后方可施工。原地面如為水磨石、地板磚等光滑地面.須先鑿成 粗糙面

B. The original cement ground should be hard, flat and sand-free. If there are empty drums, peeling, sand and cracks on the ground, it must be treated according to the requirements before construction. The original ground, such as terrazzo, floor tiles and other smooth ground, must be chiseled into rough surface first.

c、只要不積水,或不明顯滲漏就可施工,施工時現場條件相對濕度應低于85%,環境溫度在10℃以上。

C. As long as there is no seepage or seepage, construction can be carried out. The relative humidity of site conditions should be less than 85% and the ambient temperature should be above 10 C.

本站網址:http://www.www.jatrabd.com


來源:無錫環氧地坪公司  瀏覽次數:925
相關閱讀:車間無錫環氧地坪出現灰塵對機械造成的損害 | 混凝土密封固化劑使用于地坪時需要注意些什么 | 耐磨地坪會因為涂料質量差劣導致地坪損壞
 
 
產品分類    
普通型環氧地坪 環氧玻璃鋼(FRP)地坪 丙烯酸地坪
環氧砂漿地坪 乙烯基酯重防腐地坪 EPPU聚合型工業地坪
環氧彩砂地坪 非金屬金屬耐磨地坪 停車場地坪
環氧自流平地坪 混凝土密封固化劑 環保型無毒防霉墻面
環氧防靜電地坪 自流平水泥地坪 有機硅丙烯酸室外防腐地坪


聯系我們
電 話:0510-88706248/13915319875
傳 真:0510-88706348
郵 箱:Yxdspeed@163.com
網 址:www.www.jatrabd.com
地 址:無錫市東亭錫滬東路11號
版權所有:無錫市思必德科技有限公司    網站關鍵詞:無錫環氧地坪  混凝土密封固化劑  蘇ICP備20046775號    技術支持:無錫易商科技    網站地圖
友情鏈接:梳理機 臺州討債公司 銼刀 金華討債公司 鹽城環氧地坪 武漢討債公司 無錫保潔公司 腳手架廠家 無錫環氧地坪
欧美自拍亚洲精品动图_欧美精品免费观看二区_97精品伊人久久大香线蕉_亚洲熟妇色xxxxx欧美老_人妻另类 专区 欧美 制服